Wednesday, November 27, 2013
Desk top
The desktop is the last part of the lift bed project. It's 21x41 plywood, 3/4" thick. Iron on edge, with 2x2 stiffeners on the bottom. It's been assembled and sanded, 2 coats of polyurethane on the bottom. It needs another coat on the bottom and then 6-8 coats on the top. Should be ready by next weekend. I'll start assembling the bed tomorrow...
Thursday, November 14, 2013
Loft bed
One piece left to cut- a brace for the bottom of the desktop. I will begin assembling next weekend. I the meantime, I'm beginning work on an Estes Astron Elliptic and quite possibly a Quest X-15. The X-15 had a creased body tube, which has been shipped on Tuesday.
Subscribe to:
Posts (Atom)