The desktop is the last part of the lift bed project. It's 21x41 plywood, 3/4" thick. Iron on edge, with 2x2 stiffeners on the bottom. It's been assembled and sanded, 2 coats of polyurethane on the bottom. It needs another coat on the bottom and then 6-8 coats on the top. Should be ready by next weekend. I'll start assembling the bed tomorrow...
No comments:
Post a Comment