Sunday, October 6, 2013

Loft Bed

Because of the rain, it's been really slow going on the loft bed. 90% of the lumber is cut, drilled, and sanded. About 75% got 3 coats of Minwax Fast Drying Polyurethane. I'm hoping to have the rest cut, sanded, and finished by the end of next week so that I can assemble (with the help of the boy) the weekend of October 19-20. 

No comments:

Post a Comment